Artha Industrial Hill
The elevated toll cikampek will be built above the existing Jakarta-Cikampek toll road. It will ease the traffic between Artha Industrial Hill and Jakarta and other surrounding cities. It is expected to be operational in 2019.
The LRT will link a great number of destinations and integrate with other type of transportation.
High speed train will provide safe and efficient way of transport. It will provide a major boost to local business and the economy. There will be a terminal 5 minutes away from AIH.
The new International Airport West Java will be located at Kertajati, it is about 120 km from Artha Industrial Hill, or about 68 km from Bandung, capital city of West Java Province of Indonesia. It can be accessed from AIH through Cipali Toll road.
The port will be located in Subang, about 70 kilometers from Karawang. It will have a container capacity of 1.5 million 20-foot equivalent units (TEUs) by 2019 and will be expanded to 7.5 million TEUs by 2027.